ORAL
QUESTIONSADD YOUR
QUESTIONS
MEO CLASS 1 EXAM ORAL QUESTIONS AND ANSWERS - LATEST QUESTIONS | Page 13
Q. 121) Initial audit , interim audit ?
XQ. 122) Going in seca action as chief engineer. problem faced during change over ?
X1.due 2 change of grade possibility of problem with auto f.o. filter,as i experienced once,frequent increase in differential & draining.
2.due to decrease in sulphur content,decreased lubrication to plunger-barrel,increased chances of seizure of plunger-barrel,so lubricating additives are added to f.o. tank having low sulphur.
3.since booster & supply pump on old ship are not designed for presently used low sulphur,so different set of screws are provided to be changed prior change over to low sulphur.
Q. 123) Interim smc & interim doc ?
XQ. 124) Engine room sea chest main line crack action as chief engineer ?
Xstop vessel. close sea chest. stop pump/s after line is partially drained, as per location either blank and use other sea chest. various engg techniques can be utilised for repair of the crack depending on the extent and location of the crack.
Q. 125) Liner removal of engine as chief engineer ?
XQ. 126) Action in case of spark coming from main engine exhaust ?
X1.as a deck officer inform duty engineer.
2.monitor the sparks.
3.send persoonnel for frequent fire round.
4.in case dangerous cargo on deck,inform master.
